Basic Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this electrical power unit is designed to the operation of two independent circuits. Which are respectively for the most important and subordinate platforms with the double scissors lift. Two cut-off valves are used for reducing the machine manually in situation of power reduction. If extra independent circuits are necessary for the application please get hold of us for availability.
Remark: one. Please seek advice from our income engineer for the various pump displacement, motor power or tank capability.
two. CSA or UL licensed motors can be found on request.
Unique Notes
1. The AC motor is of S3 duty cycle, which might only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic parts concerned ahead of set up of the electrical power unit.
3. Viscosity in the oil shoud be 15~46 cst,and also the oil should really be clean and cost-free of impurities,N46 hydraulic oil is encouraged.
4. The energy unit really should be mounted vertically.
five. Check the oil degree while in the tank just after the preliminary operating of your power unit.
6. Oil transforming is required immediately after the preliminary one hundred operation hours,afterwards after just about every 3000 hrs.